Post Response Return to Index Read Prev Msg Read Next Msg

BLOGS


An Even Slower Road Home

Posted By Fragments From Floyd
Date Friday, 19 July 2019, at 7:09 a.m.
So VDOT got a late start on this project, supposed to have begun last Monday. The foreman realized how bad things really were, and instead of the single pipe with a 4 inch concrete cap, he decided this replacement needed two pipes and an 8 inch cap. You can see they’ve dammed the creek upstream … Continue reading An Even Slower Road Home

Read more

This post was created from content on the Internet.

Password
Post Response Return to Index Read Prev Msg Read Next Msg